Upgrade of electrical system

Upgrades of electrical system
For a reliable production

Electrical components age quickly, are discontinued or cause unplanned downtime. Therefore, state-of-the-art electrical engineering pays off. It prevents such breakdowns and ensures the rapid availability of spare parts, which can then be additionally installed within a very short time if required.

Upgrades from one source
customer-specific and economical

Our electrical engineering experts design and engineer the upgrades according to your individual needs. These can be upgrades of the control and regulation systems, the visualization or a combination of all of these. A big advantage: The complete upgrade comes from one source - planning, production, implementation and spare parts delivery is handled by us and our Siempelkamp affiliates. This reduces the total costs and, together with optimized plant availability, ensures a fast ROI. Measurements after such upgrades have shown the ROI is possible in less than one year.

Overview
Product advantages and customer benefits

  • Higher plant availability
  • Quick and easy availability of spare parts
  • Shorter downtimes for future installation of spare parts
  • Availability of qualified service technicians for current plant technology

These product advantages result in the following concrete benefits for you:

  • Maximum availability of plant and spare parts

Info video drive technology


Success Stories

Electrical upgrade for EGGERPLC-UpgradeElectrical modernization for WeyerhaeuserElectrical upgrade

In focus: the customer benefit

To meet your individual needs, we have grouped our products and services according to specific customer benefits. Below you will find further products that meet the same requirements as the above mentioned:

Plant availability

Your contact

Manuel Thiesen
Tel. +49 2151 92-4839
manuel.thiesen@sls.siempelkamp.com