The retrofit examples listed here give a first impression of the efficiency advantages that result from the appropriate retrofit measure. They also show the range and scale of the solutions. In any case the key to success: optimal cooperation with our customers.

Project SMARTPLY
Prod-IQ® update

For SMARTPLY in Waterford, Ireland, we remotely converted the entire plant MES to Prod-IQ®.

More about the SMARTPLY project

Project EGGER Barony
Upgrade of ContiRoll®

The ContiRoll® at the EGGER Barony site in Auchinleck, Scotland, is prepared for the future through a comprehensive electrical upgrade.

More about the EGGER-Barony project

Project Weyerhaeuser
Completed on schedule

Successfully brought up to date within 17 days: the upgrade of the electrical system for a ContiRoll®.

More about the Weyerhaeuser project

Project Fermacell
Concentrated teamwork

A prime example of reliable project implementation and teamwork: the modernization of the mobile cycle press for gypsum fiberboard at Fermacell.

More about the Fermacell project

Project Finsa
Servicio integral

For Finsa we completed several retrofits which, among other things, have brought the ContiRoll® operated there to the current state of the art.

More about the Finsa projects

Project SWISS KRONO TEX
Renewed star cooler

For SWISS KRONO TEX, we modernized the star cooler at the German site in Heiligengrabe.

More about the SWISS KRONO TEX project

Project PLC-Upgrade
Higher operational reliability

The electrical system of the plant of a Japanese customer was brought up to date with a PLC modernization.

More about the PLC project

Project Tafisa
Upgrade of ContiRoll®

For Tafisa Canada we comprehensively modernized the particle board press within two months.

More about the Tafisa project

Project Arauco
Milestone Ecoresinator

At Jaguaraiva in Brazil, location of the Chilean wood-based products manufacturer Arauco, we commissioned the second Ecoresinator.

More about the Ecoresinator project

Pressure distribution plates
Material savings

We updated an MDF plant (7’ x 38.5 m) from 1998 for a long-standing-customer within only a short time.

More about this project

Upgrade of electrical system
Significantly higher availability

For a long-standing customer we completed an upgrade of the plant automation of the forming line, press and double cross-cut saw.